Prosperous-Sunrise
Rate Per SQFT Rs. 4500/-
BHK Flat & Floor Area In Sqft Price
2               A 1   951 4759700
3 B 1 1275 6282500
3 C 1 1233 6085100
3              D 1   1335 6564500
2 A 2 951 4759700
3 B 2 1275 6282500
3 C 2 1233 6085100
3 D 2 1335 6564500
2 A 3 951 4759700
3 B 3 1275 6282500
3 C 3 1233 6085100
3 D 3 1335 6564500
2 A 4 951 4759700
3 B 4 1275 6282500
3 C 4 1233 6085100
3 D 4 1335 6564500
2 A 5 951 4788230
3 B 5 1275 6320750
3 C 5 1233 6122090
3 D 5 1335 6604550
2 A 6 951 4841760
3 B 6 1275 6384000
3 C 6 1233 6184080
3 D 6 1335 6669600
2              A 7   951 4870290
3 B 7 1275 6422250
3 C 7 1233 6221070
3              D 7   1335 6709650
2 A 8 951 4898820
3 B 8 1275 6460500
3 C 8 1233 6258060
3 D 8 1233 6749700
2 A 9 951 4927350
3 B 9 1275 6498750
3 C 9 1233 6295050
3 D 9 1335 6789750
2 A 10 959 4993320
3              B 10   1275 6537000
3 C 10 1244 6383520
3 D 10 1335 6829800
2 A 11 959 5022090
3              B 11   1275 6575250
3 C 11 1244 6420840
3 D 11 1335 6869850
2 A 12 959 5050860
3 B 12 1275 6613500
3 C 12 1244 6458160
3 D 12 1335 6909900
Total cost is inclusive of car parkings, EB deposits, Documentaion Charges, Infrastructue charges, Corpus fund (life time deposit) and Maintenance charges for 24 months
Payment Terms:
20% on booking.
35% on 30 days from the date of agreement.
5% on commencement of plinth beam
2% oncommencement of 1st roof slab.
2% on commencement of 2nd roof slab.
2% on commencement of 3rd roof slab.
2% on commencement of 4th roof slab.
2% on commencementof 5th roof slab.
2% on commencement of 6th roof slab.
2% on commencement of 7th roof slab.
2% on commencement of 8th roof slab.
2% on commencement of 9th roof slab.
2% on commencement of 10th roof slab.
2% on commencement of 11th roof slab.
2% on commencement of 12th roof slab.
6% on completion of brickwork.
5% on completion of internal plastering.
4% on completion of flooring.
1% on handing over.
Note: Price mentioned above dose not include Registration charges & Taxes.
 
Location : Prosperous Shine
259/1A 1B, Poonamallee, Banglore Bye Pass Road, Chennai..
Plan/Area Details :
SITEPLAN (Click To View in Full Screen Mode)
A-B-C & D-FLAT (Click To View in Full Screen Mode)
Projects Details :
General :
Two numbers of automatic lift.
Banquet Hall.
Gymnasium.
Play Area.
Polished granite for staircase and lobby.
Access card entry from the Ground Floor.
Intercom facility from the security to each flat.
Automatic Generator Back up.
Sewage treatment plant.
Ample car parking space.
Underground water sumps.
Common overhead tanks.
3 Bore wells.
Compound wall with appropriate gates.
Fire Safety equipments and measures.
Flooring And Wall Tile :
Living, dining, bedrooms, and kitchen will have 24”x 24” Vitrified tiles.
Toilets will have first quality anti skid ceramic tiles for floor and ceramic skirting 7' high on walls (12" x 8" Plain Series)
Kitchen :
First quality ceramic wall tiles for 2 feet above the granite platform.
Stainless steel sink with a drain board..
Doors & Windows :
Main door / Internal Doors : Teak wood frame with Flush doors.
Windows : Aluminium frame with glass shutters.
Painting Finishes :
Main Door will be Melamine finish.
Internal Door will be of enamel Paint.
All walls except kitchen, service, balconies and toilets will be coated with patti and finished with emulsion paint.
Ceilings will be finished with Ultra white paint.
External walls will be finished with Emulsion Paint or equivalent.
Plumbing & Sanitary :
Toilets will be provided with white European water Closet (EWC) & a washbasin.
High quality chromium plated fittings will be provided in toilets.
Electrical :
Modular switches with Anchor or equivalent make.
Provision for Split AC in all bedrooms and living room.
Television and telephone point in living & master bedroom.
Generator backup for common areas, lifts, pumpsand 500W in each flat.
Note : All Amenities & Specifications are subject to change at the time of executing agreement.

"Imagination is the beginning of creation. You imagine what you desire, you will what you imagine, and at last, you create what you will "

UPCOMING PROJECTS

Upcoming-Projects

COMPLETED PROJECTS

Completed-Projects